AHCGRI501Design roof gardens

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for AHCGRI501 must cover

37 assessable components: 3 elements (16 performance criteria), 7 performance evidence and 10 knowledge evidence requirements, plus 4 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Research roof garden design information

  • 1.1Establish purpose, functions, benefits and risks associated with roof gardens
  • 1.2Access and interpret building regulations, standards and codes, and relevant national, state, territory and local authority policies, procedures and permits to determine applicable restrictions or limitations relating to roof gardens
  • 1.3Identify environmental and energy efficiency impacts of green infrastructure design
  • 1.4Identify factors that will impact roof garden designs

2 Scope project requirements

  • 2.1Consult with client to clarify type, purpose, features and requirements of roof garden to inform design parameters
  • 2.2Identify project location and complete site analysis
  • 2.3Confirm structural requirements relating to roof gardens with architect, engineer and/or other relevant specialists
  • 2.4Establish constraints and/or opportunities for meeting client expectations and requirements, and clarify design scope with client

3 Design roof gardens

  • 3.1Acquire engineering plans to determine drainage outlets and weight limits
  • 3.2Design roof garden to utilise spatial availability, enable access and egress, and comply with building regulations, standards and codes
  • 3.3Consult growing media and/or horticulture specialist on selection of media and plants based on the location conditions and maintenance requirements
  • 3.4Document specifications for waterproofing, irrigation and drainage systems and/or lighting, including recommended suppliers
  • 3.5Calculate total weight of materials, components and water in consultation with suppliers, green infrastructure specialists and/or building professionals to ensure the total weight complies with parameters set by an engineer
  • 3.6Design plant and component anchoring system appropriate to project location and weather conditions in consultation with engineers and other building and/or landscape professionals
  • 3.7Prepare a design concept of proposed roof garden, confirm with specialists and/or building professionals, and present to client
  • 3.8Prepare design plans, specifications, maintenance program and estimated costs for roof garden, in consultation with qualified specialist if required

Performance evidence

  • met design brief and project parameters
  • consulted with green infrastructure specialists, building and/or landscape professionals
  • complied with relevant regulatory authorities’ policies and procedures, building regulations, standards and codes
  • complied with the project design parameters set by an engineer or specialist
  • used measurements and formulas to calculate material quantities, weights and estimated project costs
  • incorporated provision of access and egress for construction and maintenance
  • developed and documented a maintenance program to ensure sustainability of the green infrastructure

Knowledge evidence

  • professional practice requirements in roof garden design, including: limitations and boundaries, roles and responsibilities of building professionals and authorities, factors influencing roof garden design for existing and new buildings
  • relevant legislation, standards and codes, including the National Construction Code (NCC)
  • roof garden recirculating and non-recirculating/flood-drain systems
  • site analysis, including: climatic factors of wind, temperature, sunlight, rainfall and irrigation, drainage, site access for construction and installation and ongoing maintenance
  • reasons for creating roof gardens, including: environmental, economic, social
  • features, benefits and risks of roof gardens
  • characteristics, properties and limitations of materials used for roof gardens, including: water-proofing material, substrate, root barrier, drainage and irrigation systems, storing and recycling water systems, lighting systems
  • characteristics, properties and limitations of plants used for roof gardens
  • properties of types of green roofs, including: extensive, intensive
  • project cost estimating, including: materials and labour, build costs, including transporting and storing materials and equipment, and provision of safety and equipment, ongoing maintenance

Foundation skills

  • Reading: Research and analyse researched information to select materials and components for roof gardens
  • Writing: Develop relevant documentation using digital technology
  • Oral communication: Determine stakeholder requirements through open-ended questioning, active listening and summarising
  • Numeracy: Apply decimals and percentages to estimate and calculate project costs Use measurements and formulas to calculate length, area, volume and weight Interpret data and numerical data displayed in graphs, charts and/or tables

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing AHCGRI501

What does an assessment tool for AHCGRI501 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for AHCGRI501 needs to address all 37 unit components: 3 elements with 16 performance criteria, 7 performance evidence requirements, 10 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for AHCGRI501?

Auditori pulls the current release of AHCGRI501 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for AHCGRI501 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing AHCGRI501 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of AHCGRI501, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your AHCGRI501 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate AHCGRI501 free